Oil and gas project delivery demands project controls that provide real-time visibility into cost, schedule, and resource deployment. Traditional tools create information lag. Desapex integrates 4D/5D BIM with ISO 19650 information management to create a unified digital command center for project execution.
Our Digital-First Approach
Establish CDE
Establish a Common Data Environment (CDE) per ISO 19650 from project inception.
Link 4D Schedules
Link the 3D design model to Primavera P6 or MS Project schedules
Apply 5D Costing
Link to cost databases (5D) so design changes cascade to budget impact assessments.
Plan Turnarounds
Use 3D models for turnaround scope definition, work packaging, and spatial resource loading.
Monitor Progress
Use periodic laser scanning compared against the 4D schedule for objective physical percent-complete data.
Core Deliverables
4D construction sequencing with animated phasing simulations for heavy lift plans.
5D cost-loaded BIM with real-time earned value management (EVM).
Digital what-if scenario modeling to assess the impact of weather or procurement delays.
A 15-25% improvement in turnaround planning efficiency through 3D-based scope definition
Why Choose Desapex
Turnaround events have extremely high daily costs of delay (often $500,000 to $1 million per day). Our 4D tools give planners visual, spatial understanding of work sequences to optimize crew deployment and compress shutdown duration.
Unique Selling Proposition
Our USP is our ISO 19650 BSI Kitemark certification, providing oil and gas clients with independently verified assurance that every document and model revision is managed with the rigor that safety-critical facilities demand.