Digital EPC Project Controls & 4D Turnaround Planning

Digital EPC Project Controls & 4D Turnaround Planning

Digital EPC Project Controls & 4D Turnaround Planning

Service Overview

Oil and gas project delivery demands project controls that provide real-time visibility into cost, schedule, and resource deployment. Traditional tools create information lag. Desapex integrates 4D/5D BIM with ISO 19650 information management to create a unified digital command center for project execution. 

Our Digital-First Approach

Establish CDE

Establish a Common Data Environment (CDE) per ISO 19650 from project inception.

Link 4D Schedules

Link the 3D design model to Primavera P6 or MS Project schedules

Link 4D Schedules

Link the 3D design model to Primavera P6 or MS Project schedules

Apply 5D Costing

Link to cost databases (5D) so design changes cascade to budget impact assessments.

Apply 5D Costing

Link to cost databases (5D) so design changes cascade to budget impact assessments.

Plan Turnarounds

Use 3D models for turnaround scope definition, work packaging, and spatial resource loading.

Plan Turnarounds

Use 3D models for turnaround scope definition, work packaging, and spatial resource loading.

Monitor Progress

Use periodic laser scanning compared against the 4D schedule for objective physical percent-complete data.

Monitor Progress

Use periodic laser scanning compared against the 4D schedule for objective physical percent-complete data.

Core Deliverables

  • 4D construction sequencing with animated phasing simulations for heavy lift plans.

  • 5D cost-loaded BIM with real-time earned value management (EVM).

  • Digital what-if scenario modeling to assess the impact of weather or procurement delays.

  • A 15-25% improvement in turnaround planning efficiency through 3D-based scope definition

Why Choose Desapex

Turnaround events have extremely high daily costs of delay (often $500,000 to $1 million per day). Our 4D tools give planners visual, spatial understanding of work sequences to optimize crew deployment and compress shutdown duration.

Unique Selling Proposition

Our USP is our ISO 19650 BSI Kitemark certification, providing oil and gas clients with independently verified assurance that every document and model revision is managed with the rigor that safety-critical facilities demand.

Image

Let’s make your next project on time and within budget.