Maritime Green Infrastructure & Port Sustainability

Maritime Green Infrastructure & Port Sustainability

Maritime Green Infrastructure & Port Sustainability

Service Overview

Shipyards face intense and growing regulatory pressure regarding environmental performance including anti-fouling waste management, ballast water treatment compliance, air emissions from vessel operations, and industrial wastewater treatment. Desapex integrates environmental engineering directly into the shipyard BIM model to deliver verifiable, measurable sustainability outcomes.

Our Digital-First Approach

Embed Environmental Systems

Model environmental systems (wastewater treatment, stormwater management, dust suppression) as integral parts of the infrastructure design, not as afterthought additions.

Coordinate Spatially

Ensure that treatment structures and monitoring points are perfectly coordinated with production infrastructure from design through operations.

Coordinate Spatially

Ensure that treatment structures and monitoring points are perfectly coordinated with production infrastructure from design through operations.

Core Deliverables

  • Industrial wastewater treatment system design (sandblasting residue, paint waste).

  • Stormwater management engineering with oil-water separation.

  • Air quality management (paint shop ventilation, welding fume extraction).

  • Shore power infrastructure design enabling vessels to connect to grid electricity.

  • IGBC and green port certification consulting.

Why Choose Desapex

Environmental compliance is increasingly a strict condition for shipyard operating permits and classification society approval. Desapex’s engineering-led approach delivers environmental systems that are specifically designed for performance, not just compliance reducing long-term operating costs while strictly meeting regulatory requirements.

Unique Selling Proposition

Our USP is that we integrate environmental engineering into the shipyard BIM model, ensuring that vital treatment systems, containment structures, and emissions controls are spatially coordinated with all other production infrastructure.

Image

Let’s make your next project on time and within budget.

Image

Let’s make your next project on time and within budget.

Image

Let’s make your next project on time and within budget.