
Client Segment:
Vertical:
Other Services
Service Overview
Factory building design must start with the production process and work outward. Column spacing, floor design, ventilation, and electrical distribution must all be driven by the production equipment and process requirements. Desapex coordinates all of these complex requirements in a federated BIM model.
Our Digital-First Approach
Model as One System
We model production equipment, material handling systems, and building structure in a single BIM environment.
Core Deliverables
Industrial structural design, including crane runway integration and seismic detailing.
Production equipment foundation design, including vibration isolation for heavy machinery.
Industrial MEP design (compressed air, process water, industrial gas, effluent treatment).
Clean zone and controlled environment design per ISO 14644 classification requirements.
Why Choose Desapex
Complex factory environments with stringent environmental control requirements (temperature, humidity, particulate) benefit massively from our BIM-coordinated design. We integrate architectural, structural, HVAC, fire protection, and process equipment in extremely tight spatial envelopes, preventing construction conflicts.
Unique Selling Proposition
Our USP is that we design the factory as a production system, not just a building. The BIM model contains production equipment, material handling, and utility distribution alongside structural and architectural elements, giving you a complete digital representation of your operation.
