A man stands while two people sit at a table in an office setting, smiling and engaged in conversation. The mood is friendly and collaborative.

Production-Optimized Design & Industrial MEP Engineering

Production-Optimized Design & Industrial MEP Engineering

Service Overview

Factory building design must start with the production process and work outward. Column spacing, floor design, ventilation, and electrical distribution must all be driven by the production equipment and process requirements. Desapex coordinates all of these complex requirements in a federated BIM model.

Our Digital-First Approach

Model as One System

We model production equipment, material handling systems, and building structure in a single BIM environment.

Coordinate Simultaneously

Equipment foundations are designed with an awareness of adjacent piping, underground utilities, and structural load paths.

Coordinate Simultaneously

Equipment foundations are designed with an awareness of adjacent piping, underground utilities, and structural load paths.

Eliminate Clashes

This simultaneous coordination eliminates the sequential design-then-coordinate approach that generates the majority of factory construction clashes.

Eliminate Clashes

This simultaneous coordination eliminates the sequential design-then-coordinate approach that generates the majority of factory construction clashes.

Core Deliverables

  • Industrial structural design, including crane runway integration and seismic detailing.

  • Production equipment foundation design, including vibration isolation for heavy machinery.

  • Industrial MEP design (compressed air, process water, industrial gas, effluent treatment).

  • Clean zone and controlled environment design per ISO 14644 classification requirements.

Why Choose Desapex

Complex factory environments with stringent environmental control requirements (temperature, humidity, particulate) benefit massively from our BIM-coordinated design. We integrate architectural, structural, HVAC, fire protection, and process equipment in extremely tight spatial envelopes, preventing construction conflicts.

Unique Selling Proposition

Our USP is that we design the factory as a production system, not just a building. The BIM model contains production equipment, material handling, and utility distribution alongside structural and architectural elements, giving you a complete digital representation of your operation.

Image

Let’s make your next project on time and within budget.

Image

Let’s make your next project on time and within budget.

Image

Let’s make your next project on time and within budget.