Airside Construction Coordination & Phased Commissioning

Airside Construction Coordination & Phased Commissioning

Airside Construction Coordination & Phased Commissioning

Service Overview

Airport construction must maintain operational continuity throughout the build a requirement that makes every construction activity a potential operational disruption. Desapex’s digital construction management provides the precision coordination needed to execute complex construction works in one of the most regulated and operationally sensitive environments.

Our Digital-First Approach

Monitor with Reality Capture

Reality capture is deployed at every construction milestone, with scan data automatically compared against the design BIM model.

Validate Constantly

For terminal works, this catches MEP routing errors before ceiling close-up. For airside works, it verifies apron and taxiway pavement levels against drainage design requirements.

Validate Constantly

For terminal works, this catches MEP routing errors before ceiling close-up. For airside works, it verifies apron and taxiway pavement levels against drainage design requirements.

Core Deliverables

  • Phased terminal construction management maintaining passenger processing capacity.

  • Airside pavement construction coordination with NOTAM management for runway closures.

  • MEP, BHS, fire life safety, and security system commissioning coordination.

  • As-built BIM model delivery with verified system documentation.

Why Choose Desapex

Every day of delayed airport commissioning represents lost aeronautical and non-aeronautical revenue. Desapex’s digital commissioning management ensures that system-by-system handover is coordinated, documented, and verified preventing the commissioning bottlenecks that traditionally extend airport opening dates by months.

Unique Selling Proposition

Our USP is that Desapex’s commissioning documentation is not a separate paper exercise it is embedded in the as-built BIM model. Every system test result, every snagging item, every commissioning certificate is linked to its 3D location in the model, creating a searchable, visual commissioning record that airport operations teams can use from day one. 

Image

Let’s make your next project on time and within budget.

Image

Let’s make your next project on time and within budget.

Image

Let’s make your next project on time and within budget.