Join our webinar on ITC journey with Desapex towards adoption of ISO19650 standards
Register Now!

BIM Adoption: It's Not an All-or-Nothing Approach

,
March 11, 2024

Introduction

Building Information Modeling (BIM) has revolutionized the architecture, engineering, and construction (AEC) industries. It's not just a tool but a process that involves creating and managing digital representations of physical and functional characteristics of places. BIM facilitates communication, collaboration, and coordination among various stakeholders, leading to efficient project management and execution. However, many organizations hesitate to adopt BIM, fearing that it requires a complete overhaul of their existing processes. This belief is a misconception. BIM adoption can be a gradual and tailored process, aligning with an organization's unique needs and capabilities.

Understanding BIM and Its Benefits

BIM is more than just 3D model. It's a holistic process that encompasses the generation, storage, and management of digital representations of the physical and functional characteristics of a building project. BIM models are used for decision-making throughout a building's lifecycle, from earliest conception to demolition.

Key Benefits of BIM:

  1. Enhanced Collaboration: BIM facilitates better collaboration among architects, engineers, constructors, and clients.
  2. Improved Visualization: It helps in visualizing the project in 3D during the planning stage, reducing the likelihood of errors.
  3. Efficient Project Management: BIM streamlines project management by integrating different aspects of the construction process.
  4. Cost and Time Savings: By identifying potential issues early, BIM helps save time and reduce costs.
Key Benefits of BIM

Gradual Adoption of BIM

Adopting BIM doesn't have to be an all-or-nothing approach. Organizations can gradually integrate BIM into their processes. Here's how:

1. Assessing Current Capabilities

The first step is to assess the current processes, tools, and skills available within the organization. Understand what aspects of BIM can be integrated with minimal disruption.

2. Setting Realistic Goals

Set achievable goals for BIM adoption. These goals should align with the organization's broader objectives and capabilities. For instance, start with 3D modeling for a small project before advancing to more complex BIM functionalities.

3. Training and Skill Development

Invest in training for staff. BIM requires a certain skill set, and your team must be equipped with the necessary knowledge.

4. Pilot Projects

Start with a pilot project. Choose a small, manageable project to implement BIM. This approach allows teams to get comfortable with the technology and processes before scaling up.

5. Integrating BIM into Existing Processes

Integrate BIM with existing workflows gradually. This might mean starting with BIM for design visualization and then slowly incorporating it into other stages like construction management and facility operation.

6. Collaborative Approach

Encourage a collaborative approach within and between teams. BIM is as much about people and processes as it is about technology.

7. Continuous Evaluation and Adaptation

Regularly evaluate the outcomes of BIM adoption and be prepared to adapt. Continuous improvement is key to fully leveraging the benefits of BIM.

Adoption of BIM

Overcoming Challenges in BIM Adoption

  1. Resistance to Change: Change is often met with resistance. Address this by highlighting the benefits of BIM and involving staff in the transition process.
  2. Cost: Initial costs can be a barrier. However, long-term savings and efficiency gains can offset these costs.
  3. Complexity: BIM can be complex, but starting small and gradually increasing complexity can help teams adapt.

Case Study: Real Estate Development Company's BIM Adoption Journey

Background

Due to a Non-Disclosure Agreement (NDA), the name of the real estate development company involved in this case study cannot be disclosed. This company, a leader in residential and commercial building projects, faced significant challenges with project delays, cost overruns, and inefficient collaboration. Recognizing the potential of Building Information Modeling (BIM) to address these issues, they embarked on a journey to integrate BIM into their operations. Crucial to their successful adoption of BIM was the establishment of a Common Data Environment (CDE).

Phase 1: Assessment and Planning

Objective:

Understand current capabilities and identify how BIM can enhance their processes.

Assessment: The company evaluated its existing workflows, software tools, and the skill level of its workforce.

Strategic Planning: Key areas were identified where BIM could bring significant improvements, such as in design visualization, clash detection, and overall project coordination.

Phase 2: Goal Setting and Training

Objective:

Set achievable BIM implementation goals and enhance workforce skills.

Goal Setting: The initial focus was on using BIM for visualization and clash detection.

Training: Targeted training programs were conducted to upskill staff in basic BIM functionalities.

Phase 3: Pilot Project

Objective:

Test BIM implementation in a controlled setting.

Pilot Selection: A medium-scale residential project was chosen for the pilot.

BIM Implementation: BIM was used for creating detailed 3D models, enhancing visualization for clients and stakeholders.

Phase 4: Integration, Collaboration, and CDE Establishment

Objective:

Seamlessly integrate BIM into existing workflows and promote collaboration.

Integration: Following the pilot's success, BIM was gradually integrated into larger projects.

Collaboration: Regular collaborative sessions were held to foster communication across departments.

Common Data Environment (CDE): Establishing a CDE was critical. This centralized repository allowed for efficient data management, access, and sharing, ensuring all stakeholders were working with consistent, up-to-date information.

Phase 5: Continuous Evaluation and Expansion

Objective:

Regularly assess BIM adoption progress and explore advanced features.

Evaluation: The company monitored key metrics, such as time savings, cost efficiency, and error reduction.

Expansion: They began exploring more advanced BIM features, including 4D and 5D capabilities.

Results

Operational Efficiency: The company observed a 20% improvement in project delivery time and significant cost savings.

Quality Enhancement: There was a marked decrease in design conflicts and construction errors.

Client Satisfaction: The use of BIM, particularly the visualization aspects, led to increased client satisfaction.

Objectives achieved

For this company, the gradual and structured approach to BIM adoption proved highly effective. Establishing a Common Data Environment was a pivotal aspect of their strategy, ensuring that data consistency and accessibility were maintained across all projects. This case study demonstrates how real estate development companies can successfully integrate BIM into their existing operations, leading to improved efficiency, quality, and client satisfaction. The emphasis on collaboration and central data management via a CDE was key to their successful BIM adoption.

Conclusion

Adopting BIM is not an all-or-nothing process. It's a gradual transition that can be tailored to fit an organization's specific needs and capabilities. By starting small, setting realistic goals, and continuously adapting, organizations can smoothly transition into BIM, reaping its numerous benefits without disrupting their existing processes. Remember, the journey to BIM adoption is a marathon, not a sprint, and it's about finding the right balance that works for your organization.

Learn how Desapex can help you implement BIM by contacting sales@desapex.com

Share on social media:

Related Articles:

Browse all articles
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.